The Plant
The plant was built in the village of Lastochka, after which it is named. Water is transported from the source to the plant through a two-kilometre mineral water pipeline from the well.
In the water treatment facility, the water passes through a system of sand and sorption filters, removing natural impurities and excess iron.
The water then moves to the bottling line. At the same time, the bottles are prepared: PET bottles are blow-moulded from plastic preforms in a special oven.